最終更新日:2024/08/02
The construction workers used double-rippers to remove the old flooring.
正解を見る
The construction workers used double-rippers to remove the old flooring.
編集履歴(0)
The construction workers used double-rippers to remove the old flooring.
The construction workers used double-rippers to remove the old flooring.