The lanes of traffic merged.
The 13th class were the first Garratts on the line and on arrival were set to work on the Villa [sic: Vila] Machado-Umtali section, increasing the train load from the 350 tons hauled by the 9th class to 450 tons.
About all George had scheduled during these long hours were a few delegation drop-bys, a duty he shared with other party luminaries, to motivate the troops for the fall campaign.
Arios neat-handedly put finishing touches on taping up the unconscious engineer's hands, mouth, and eyelids while Mr. Scott lovingly removed the hatch cover and contemplated the main power-conversion stem of the Savasci's engines.
アカウントを持っていませんか? 新規登録
アカウントを持っていますか? ログイン
DiQt(ディクト)
無料
★★★★★★★★★★