最終更新日:2022/12/24
The channel at Chan-chiang is being dredged to a depth of 50 feet enabling tankers of 70,000 tons to call.
編集履歴(0)
The channel at Chan-chiang is being dredged to a depth of 50 feet enabling tankers of 70,000 tons to call.