最終更新日:2022/12/24
The whole of the main lines to be electrified were being equipped with four-aspect colour-light signals, automatically operated, where appropriate, and spaced to give a 5min headway throughout.
編集履歴(0)
The whole of the main lines to be electrified were being equipped with four-aspect colour-light signals, automatically operated, where appropriate, and spaced to give a 5min headway throughout.