最終更新日:2022/12/24
The work involved a complete rewiring of the system, while the addition of four higher-capacity Mechan jacks and the increased length of the new train meant the entire floor (the length of four train carriages) had to be dug up, levelled and strengthened to meet tolerance requirements.
編集履歴(0)