最終更新日:2022/12/24
In all three tunnels the full face was drilled at once. […] [T]he mucking machine was immediately converted into a drilling jumbo upon completion of the mucking operation. Both jumbos carried all the posts and bars necessary for the mounting in any desired position of four automatic DA-30 drifters.
編集履歴(0)
元となった例文