最終更新日:2022/12/24
With the cutting out of the previous recovery times for electrification work, curtailment of station times and acceleration, considerable reductions have been made in the overall schedules.
編集履歴(0)
With the cutting out of the previous recovery times for electrification work, curtailment of station times and acceleration, considerable reductions have been made in the overall schedules.