最終更新日:2022/12/24
On a tramway installation, drag the haul rope through each intermediate tower, placing it in the snatch block as the tower is passed to lighten the load.
編集履歴(0)
On a tramway installation, drag the haul rope through each intermediate tower, placing it in the snatch block as the tower is passed to lighten the load.