最終更新日:2022/12/24
The end of ‘dumsor’ comes just at the end of the timeline that the Minister of Power, Mr Kwabena Donkor, gave that he would resign if the load shedding did not end. In March this year, Dr Donkor obligated himself to end dumsor by the end of December 2015.
編集履歴(0)