最終更新日:2022/12/24
They will be called upon to deal with freight trains of up to 900 tons over gradients considerably steeper than those of the Central Section—for example, the frequent stretches of 1 in 100 between Victoria and the Medway towns—and their running to fast schedules will include the haulage of the Night Ferry
, which may load up to as much as 700 tons, and fully-fitted trains of 30 or more heavy Continental train ferry wagons.
編集履歴(0)
元となった例文
They
will
be
called
upon
to
deal
with
freight
trains
of
up
to
900
tons
over
gradients
considerably
steeper
than
those
of
the
Central
Section—for
example,
the
frequent
stretches
of
1
in
100
between
Victoria
and
the
Medway
towns—and
their
running
to
fast
schedules
will
include
the
haulage
of
the
"Night
Ferry",
which
may
load
up
to
as
much
as
700
tons,
and
fully-fitted
trains
of
30
or
more
heavy
Continental
train
ferry
wagons.