最終更新日:2022/12/24
When the widening is complete, the majority of the trains from Tees-side and the North which have hitherto had to be routed via the Leeds Northern line (Ripon, Harrogate and Wetherby) will be diverted over the main line via York. This avoids the necessity to provide banking engines on the Leeds Northern route and will result in speedier transit times and the more efficient and economical use of engines and train crews.
編集履歴(0)
元となった例文
When
the
widening
is
complete,
the
majority
of
the
trains
from
Tees-side
and
the
North
which
have
hitherto
had
to
be
routed
via
the
Leeds
Northern
line
(Ripon,
Harrogate
and
Wetherby)
will
be
diverted
over
the
main
line
via
York.
This
avoids
the
necessity
to
provide
banking
engines
on
the
Leeds
Northern
route
and
will
result
in
speedier
transit
times
and
the
more
efficient
and
economical
use
of
engines
and
train
crews.