最終更新日:2022/12/24
The new depot, on which work started in May, 1956, has three reception roads leading to 13 sidings capable of taking 25 trains, a 450 ft.-long car examination shed with nine roads, a lifting shop with two roads and three permanent way sidings.
編集履歴(0)